10 October 2015 – Frame walls almost complete
By Saturday 10 October virtually all the timber frame walls (other than the main gable end which needs to be fitted at the same time as the roof) have been erected ready for the roof structure to start on Monday 12 October. Only come up with one problem so far – the window in Read More …