The build has gone through what is likely to be the most dramatic period of rapid change it will see. Five weeks ago there was only a set of bare slabs, there is now something that looks like a house – albeit with a distinct lack of external blockwork which is currently only up to lower floor lintel height. However there is the prospect of the zinc roof and the windows both starting to be installed in a week’s time.
The following set of pictures gives a feel for the speed of the change since 28 September.

The retaining wall – 25 September 2015

More timber frame – 28 September 2015

Starting to place floor joists – 30 September 2015

Posi-joists are amazing – 1 October 2015

The upper floor is starting to go up – 7 October 2015

The whole upper floor – 8 October 2015

Lifting in roof trusses – 12 October 2015

The view (without windows) – 13 October 2015

More and more like a house – 14 October 2015

This is Jonathan & Maggie’s view – 18 October 2015

Downstairs internals 3 – 18 October 2015

The roof valley structure – 18 October 2015

You can definitely get an impression of ‘house’ – 18 October 2015

The roof covering continues – 24 October 2015

View from the drive – 31 October 2015

The internal space with boarded roof – 31 October 2015

Garage gable end – 31 October 2015

Roof decking almost complete – 31 October 2015

View from Jonathan & Maggies’s garden – 31 October 2015